The mooring support structure was transported to DNS and pre-installed on forecastle deck of the FPSO by a gantry crane at dry dock.

 
  • 系泊支架是运到大连造船新厂后,用船坞龙门吊吊装在浮式生产储油装置的艏楼甲板上;
今日热词
目录 附录 查词历史