The installations for the prevention and control of environmental pollution by solid waste must be checked and accepted at the same time as the main part of the project is checked and accepted.

 
  • 对固体废物污染环境防治设施的验收应当与对主体工程的验收同时进行。
今日热词
目录 附录 查词历史