The grouting testsconducted in the karstic rock formation at Wujiangdu Hydroelectric Project and their main results are described.

 
  • 本文论述乌江渡水电站在岩溶发育地层中所进行的灌浆试验及其主要成果。
今日热词
目录 附录 查词历史