The flows within the entire system must be carefully balanced in large scale and long distance water diversion projects with multistage pump stations.

 
  • 为了保证大型长距离多级泵站引水工程运行中全系统的流量平衡,建立了全系统的仿真模型。
今日热词
目录 附录 查词历史