The facilities for prevention and control of water pollution must be designed, constructed and put to use or into operation simultaneously with the main part of a construction project.

 
  • 建设项目中防治水污染的设施,必须与主体工程同时设计,同时施工,同时投产使用。
今日热词
目录 附录 查词历史