The design drawings and/or design report(s) shall be verified by the Environmental Manager before deposit. Additional copies may be required by the Director.

 
  • 设计图则及/或设计报告在存放前须先经由环境经理核证。署长可要求额外的副本。
今日热词
目录 附录 查词历史