The cutoff wall near the dam axis, the consolidation grouting and the curtain grouting for the foundation, and the high pressure jet-grouted cutoff wall at the toe of the dam form a vertical anti-seepage system for the dam foundation.

 
  • 大坝轴线附近的防渗墙、基岩固结和帷幕灌浆,以及上游坝脚处的高压摆喷防渗墙,在坝基构成了垂直防渗体系。
今日热词
目录 附录 查词历史