The continuous prestressed beam was constructed with cantilever construction,this construction was high of technology,so the bridge was supervised and controlled in the whole construction.

 
  • 预应力混凝土连续梁桥采用挂篮现浇悬臂施工,施工技术要求高,为使得该桥顺利合拢,符合设计要求,对该桥进行施工控制。
今日热词
目录 附录 查词历史