The conditions proper for construction are air temperature above 15C,relative humidity lower than 85% and moisture content lower than 6%.

 
  • 施工温度应高于15C,相对湿度小于85%25,施工基层面含水率不大于6%25。
今日热词
目录 附录 查词历史