The complicated, uncertain and nonlinear characteristics of underground engineering are the bottlenecks of the application of MDO to underground engineering.

 
  • 地下工程的复杂性、不确定性及非线性等特征成为多学科优化设计在地下工程中应用的瓶颈。
今日热词
目录 附录 查词历史