The bed is downcut on the downstream of the Xijiang River year by year, which has increased the forecasting error of the flood forecasting schemes at the Gaoyao Hydrometric Station.

 
  • 西江下游河床逐年下切,使高要水文站洪水预报方案的预报误差增大。
今日热词
目录 附录 查词历史