The T-shaped beam hoisting is influenced and restricted because of traffic flow disturb and narrow prefabricating site.

 
  • 国道324线澄海外砂大桥工程属旧桥改建,行车干扰大,且预制场地狭小,严重影响和制约T梁的吊装施工。
今日热词
目录 附录 查词历史