The OEC management-control system aims at overall control of everything that every employee finishes on his or her job every day with a 1% increase over what was done the previous day.

 
  • OEC管理控制体系主旨在于全面控制员工所完成的工作;使其每天的工作量相对于前一天的工作量保持1%25的增长率.
今日热词
目录 附录 查词历史