The Court held that no EIS was required because the statutory 30-day deadline applying to HUD was too short to permit preparation of an EIS.

 
  • 法院认为,没有必要提供“环境影响报告书”,因为给“住房与城市开发部门”法定的30天限期太短,来不及准备一份环境影响报告书。
今日热词
目录 附录 查词历史