The Contractor shall then visually inspect them, and shall promptly give notice to the Engineer of any shortage, defect or default in these materials.

 
  • 然后,承包商应对材料进行目测检查,并应将这些材料的任何短缺、缺陷或损坏通知工程师。
今日热词
目录 附录 查词历史