您要查找的是不是:
- Analysis of overbreak or underbreak influence on surrounding rock and lining structure in TBM Construction Tunnel[J].Under ground Space, 2003, 23 (2): 124-127. TBM施工隧道超欠挖对围岩及支护结构影响分析[J].;地下空间;2003;23(2):124-127
- Mechanic Analysis of Invert Prefabricate in TBM Construction Tunnel TBM施工隧道仰拱预制块的受力分析
- Study on mechanical characteristics of precast block of inverted arch for TBM construction tunnel TBM施工隧道仰拱预制块的力学特性研究
- TBM construction tunnel TBM施工隧道
- TBM constructed tunnel 盾构隧道
- Now they can construct tunnel systems without hindrance. 现在他们可以顺利地建造隧道系统了。
- More and more TBM tunneling makes it necessary for us to study TBM construction geology. TBM越来越多地用于隧洞开挖,有必要对TBM施工地质进行研究。
- Some calculation formulas are concluded by analysing the dispatch layout method of transporting slag with train in the TBM construction,which offer some references for TBM train transportation. 通过对TBM施工中列车运输出渣系统调度规划计算方法的分析和研究,得出一些相关计算公式,从而为TBM列车运输出渣调度规划的计算提供一些参考。
- Using negative pressure air pipe to ventilate for the being constructed tunnel. 使用负压风管对在建隧道进行通风换气。
- Necessity of mid-adits on TBM construction section for super-long tunnel 超长隧洞TBM施工段设置中间施工支洞的必要性
- Anchoring and Shotcreting Support is a most practical and most effective construction technique that is extensively applied in constructing tunnel. 锚喷支护是一项广泛应用于隧洞作业的最实用、最行之有效的施工技术。
- Marrying Risk Management to Slurry TBM Construction 报告主题:风险管理是泥水盾构施工不可缺少的部分
- QUALITY CONTROL AND MANAGEMENT OF TBM CONSTRUCTION TBM施工中的质量控制与管理
- The concentration of the suspended particles at transporting dregs was determined with a light scat cring dust meter constructing tunnel. 用光散射数字粉尘计对施工隧道装运碴时颗粒物浓度进行了测定。
- The Application of TBM Construction Method in 7# Tunnel of Connection Section of Yellow River Diversion Project TBM施工法在引黄联接段7%23隧洞中的应用
- TBM construction scheme for the main horizontal tunnel passing through solution cavity in Taishan mine 塔山矿主平峒TBM过溶洞方案
- Study on TBM Construction Plan for Extra-Long Railway Tunnel in Passenger Dedicate Lines 客运专线铁路特长隧道TBM施工方案研究
- The Application of TBM Construction Method in 7~#Tunnel of ConnectionSection of Yellow River Diversion Project TBM施工法在引黄联接段7~%23隧洞中的应用
- TBM stands for tunnel boring machine. TBM是全断面隧道岩石掘进机的简称。
- A new upsurge in construction is in the making. 一个建设的新高潮正在兴起。