Supplier shoud assure the design of checking fixture to be confirmed by YFV engineer, and any structure change by the supplier should get the approval from YFV engineers.

 
  • 1供应商必须保证检具的设计需得到延锋工程师的设计确认。供应商对检具任何结构的调整需得到延锋工程师的同意。
今日热词
目录 附录 查词历史