您要查找的是不是:
- Stone masonary arch dam 砌石拱坝
- Seepage proof facing plate or watertight concrete layer often locates in stone masonry arch dam. 在上游面或内部偏上游处设置了混凝土防渗层的砌石拱坝为成层异弹模坝。
- Pingqiao Shiba Dam is the highest stone arch dam in china, and the planning has been finished by international planning company. 平桥石坝为中国第一高度石拱坝,已请国际性规划公司完成规划编制。
- Fault tree analysis is used to analyse the high arch dam risk. 摘要利用故障树分析法对高拱坝进行风险分析。
- Yangmingsha Hydropower station dam is a C15 small size aggregate concrete stone masonry double curvature arch dam with crest spillway and flip buckets for energy dissipation. 阳明山水电站拦河坝采用C15细石混凝土砌石双曲拱坝,坝顶表孔泄洪,挑流消能。
- Arch dam is one of foremost dam types in hydropower projects. 拱坝是水利水电工程中最重要的坝型之一。
- The stability of arch dam against elastic buckling has always been ignored. 摘要拱坝的抗屈曲稳定性一直是未被重视的问题。
- Overturning and sliding are seldom a factor in the design of arch dam. 拱坝设计中很少考虑倾覆和滑动的问题。
- Problems and Countermeasures of Earthquake Evaluation for High arch Dam. 高拱坝重大地震灾变评估的障碍和对策。
- Cracking Analysis of High Arch Dam Heel Based on Deformation Reinforcement. 基于变形加固理论的高拱坝坝踵开裂评价。
- A separate structure is provided to block the space between the arch dam and the reservoir bank. 需要另有一种单独的结构物来填补拱坝的库岸之间的空间。
- The dam profile design and stress analysis are the major contents in arch dam design. 拱坝的体型设计和应力分析是拱坝设计的主要内容之一。
- The dynamic performance test of dam concrete is a key problem to the construction of high arch dam at present. 大坝混凝土动态性能试验为当前高拱坝建设亟待解决的一个关键问题。
- It is cumbersome to analyze arch dam equivalent stress for the finite element results of arch dam. 摘要在拱坝有限元分析成果的基础上进行等效应力计算是件繁琐的工作。
- A mathematical model of La Xi Wa arch dam including reservoir area and cushion pool is set up and then simulated. 建立了从上游库区到下游水垫塘的整体数学模型,对拉西瓦拱坝泄洪流场进行了数值模拟。
- Based on the emulate analysis,overloading modulus and wreck evolution process of high arch dam was completed. 通过仿真分析得到了小湾拱坝在各种荷载条件下的超载系数及拱坝的破坏演变过程。
- It is concluded that both boundary conditions are suitable in calculations of arch dam seimic input model. 黏性边界或黏弹性边界均可作为拱坝地震自由场输入模型中的吸能边界。
- The aseismatic stability of abutment jointed rock mass is the key problem of high arch dam. 高拱坝体型设计是关系到大坝安全和经济的关键技术问题。
- The dam of the Dahuashui hydroelectric project is a RCC double curvature arch dam with gravity buttress on the left bank with a dam height of 134.50m. 大花水水电站拦河大坝为抛物线碾压混凝土双曲拱坝+左岸重力墩;最大坝高134.;50m;是目前国内在建的最高的碾压混凝土双曲拱坝。
- The seismic resistance of Xiaowan arch dam, where the contraction joints are considered based on substructure theory, is analyzed. 摘要应用动力非线性子结构理论,对设置伸缩横缝的小湾高拱坝实际工程结构抗震分析中的坝体横缝加抗震钢筋问题进行了研究。