Slightly open shutoff valve No. 1 and allow water to fill the tube to the top then close No. 1 shutoff.

 
  • 稍微开启关闭阀1号,将水注入管子直到顶部为止,然后关闭1号关闭阀。
今日热词
目录 附录 查词历史