您要查找的是不是:
- The safety valve test of control air bottle. 控制空气瓶安全阀试验。
- Why an Independent Food Testing Laboratory? 为什么需要一个独立的食品检测实验室?
- Meanwhile, IKEA's only product test laboratory outside Sweden will also be established in this location. 同时,宜家在瑞典本土以外的第一家测试及培训中心也将在那里建成。
- Works closely with the quality control department and the raw material test laboratory to find solution to improve quality. 与质量控制部门及原料实验室密切配合,找到提高产品质量的方法。
- Performance as established by an independent testing laboratory. 这些性能由独立的检测实验室检测确定。
- Metabolic, Age Testing Laboratory Medicine Fernando Cortizo, Ph.D. 新陈代谢、实验医学年龄测试。
- In Germany, this test mission is carried out by "The Federal Road Bureau", which possesses a test laboratory authenticated by the NCAP. 亮起警示灯,响起警告信号,然后听见液压引擎驱动器和汽车轮胎在测试车道的混凝土地上发出的摩擦声响。
- NPS is one professional third part test laboratory, dedicate to industry &consume electrical appliance test, verification &certification. NPS是一家专业的第三方测试实验室;至力于(主要从事)工业和消费电子产品的测试;验证和认证.
- Is the client empowered to perform audit checks within the testing laboratory? 是否容许客户实地突击检查实验室的工作?
- The regulations and methods for valve base seal test, valve seal test, valve strength test, long term valve test, fatigue test and operating torque test were summed up in this article. 汇总了塑料阀门产品要求的阀座密封试验、阀体密封试验、阀体强度试验、阀门长期试验、疲劳强度试验和操作扭矩的规定和方法。
- In 1993, CIW set up the first testing laboratory of IT media in China. 1993年,成立中国IT媒体第一家“评测实验室”。
- Note: The assembly will fail both the first and second check valve tests above, if shutoff No.2 leaks excessively. To test for a leaky No.2 shutoff, use the following procedure. 注意:如果2号关闭阀泄漏过于严重,则第一和第二止回阀的上述检测步骤将会失败。要检测2号关闭阀是否泄漏,请采用下列程序。
- Remove the service valves and cap the compressor ports. 卸去维修阀门,并盖住压缩机端口。
- Note: The assembly will fail both the first and second check valve tests above, if shutoff #2 leaks excessively. To test for a leaky #2 shutoff, use the following procedure. 注意:如果关闭阀2号泄漏过于严重,则上述针对第一和第二止回阀的测试就会失效。要检测泄漏的2号关闭阀,请采用下列程序。
- An in service valve suffering from Dezincification has a white powdery substance or mineral stains on its exterior surface. 应用中的阀门如果出现脱锌现象,在产品表面就会出现粉状物质或矿物污点。
- Proof of emission compliance can be documents issued by vehicle manufacturers or emission testing report issued by an approved test laboratory. 符合排放标准的证明文件可以是由汽车制造商发出的文件或认可的车辆排放测试实验室签发的排放测试报告。
- Note: The assembly will fail both the first and second check valve tests above, if shutoff No. 2 leaks excessively. To test for a leaky No. 2 shutoff, use the following procedure. 注意:如果2号关闭阀泄漏过于严重,则第一和第二止回阀的上述检测步骤将会失败。要检测2号关闭阀是否泄漏,请采用下列程序。
- The testing laboratory is set up to support the theoretical activities of research and engineering. 试验室的任务是验证研究和设计理论的正确与否。
- Adjustments for envelope squeeze on seats and valve testing are done by machine during factory assembly. 在工厂组装期间,阀座的封装挤压和阀门测试的调整都是通过机械设备进行操作。
- Results and Conclusions As the development trend for the test laboratory,LIMS should be paid attention to by the laboratory administrators who take it as an important project to study and accumulate. 结果与结论LIMS是检验实验室的发展趋势,应引起实验室管理人员的重视,将其作为一项重要的课题加以研究,做好必要的积累工作。