Segment displacement control is the most important measure to insure the tunnel linearity in accordance with the requirements of the design and the tunnel construction clearance.

 
  • 管片位移控制是确保隧道线型符合设计要求和确保隧道建筑限界的关键,同步注浆又是保证管片及时稳定的关键工序。
今日热词
目录 附录 查词历史