Secondly, a target function describing the relationship between the total downtime and the PM is given, based on the technical economy analysis.

 
  • 对预防维修进行技术经济分析,在此基础上建立了总停机时间与维修间隔期之间关系的目标函数;
今日热词
目录 附录 查词历史