Required Submittal (weeks) = maximum number of calendar weeks that initial submittals of the listed drawing(s), document(s) and/or data are required from Bidder.

 
  • 要求的交付时间=是中标者开始交付清单中所要求的图纸、文件、和/或数据时,日历中所包括星期数的最大值。
今日热词
目录 附录 查词历史