您要查找的是不是:
- The main rivers in Yichang city are Yangtze River and Qingjiang River. 宜昌境内主要河流的长江和清江。
- The front area of the landslide was cut by the branch of Qingjiang River, which offered a free face. 坡体前缘受清江支流的弧形切割,为滑坡提供了临空条件,而薄层灰岩及第四系坡积物又为易发生滑坡的地层岩性条件。
- This flood peak alternation mode had been applied in 1998 flood regulation of Yangtze and the Qingjiang river. 这种错峰方式在1998年长江、清江洪水调度中得到应用。
- Chixie is just Zhadong at the south of Liu Mountain along the bank of Qingjiang River. 柳山南麓、清江岸边的榨洞是赤穴。
- There has been significant economic and social benifits with essential condition to develop Qingjiang river valley in step form. 开发清江具有显著的经济效益和社会效益,梯级开发的条件已经基本具备。
- At the same time,the new view is advanced on the formation reason why the lower reaches of the Qingjiang river is the plain bend. 并对清江下游表现为平原型河曲的形成条件提出了新的看法。
- The Maoping landslide is a large and old landslide of the bed rock in the Geheyan reservoir area of the Qingjiang River. 茅坪滑坡是清江隔河岩库区一个大型的基岩古滑坡体。
- The Maoping landslide is located on the right bank of the Qingjiang River,Geheyan Reservoir Area in Hubei Province of China. 茅坪滑坡是清江隔河岩库区当前变形最严重的大型滑坡,其形成演化研究对于茅坪滑坡发展趋势预测和防治有重要意义。
- The reservoir functions for flood control of lower stretch of Qingjiang river and flood peak alternation with the Yangtze flood. 规划中该水库负有清江下游防洪和与长江洪水错峰的双重任务。
- This paper presents the principle and methods of hyd rofracturing goestress measurement in underground plant area of Shuibuya Project on Qingjiang River. 清江水布垭水利枢纽工程地下厂房区水压致裂法地应力测试成果表明:地下厂房区是以自重为主导的应力场,为中等地应力水平地区;
- The control of Dayantan landslide near the damsite of Shuibuya project on Qingjiang river was one of the important engineering problems on the hydropower project construction. 摘要清江水布垭坝址附近大岩淌滑坡处理是枢纽建设的重大工程问题之一。
- Comprehensive model test of reinforcement scheme is performed for Geheyan gravity-arch dam on the Qingjiang River using geomechanical modeling technique. 本文采用地质力学模型试验技术对清江隔河岩重力拱坝加固方案进行了整体模型试验。
- This paper discusses the application of remote sensing technique in investigating geological and morphological tourist resources in the Qingjiang river valley. 以清江流域为例,探讨了遥感在地质地貌旅游资源调查中的应用;
- Abstract: This paper discusses the application of remote sensing technique in investigating geological and morphological tourist resources in the Qingjiang river valley. 文摘:以清江流域为例,探讨了遥感在地质地貌旅游资源调查中的应用;
- XU Rui-chun, XU Tong-hai.Study on stability of Yangjiacao slide mass in the Geheyan reservoir on Qingjiang river[J].Journal of Geomachics, 1999, 5(2): 1-9. [1]徐瑞春;徐同海.;清江隔河岩水库杨家槽滑坡稳定性工程地质研究[J]
- Shuibuya Hydropower Project is the first step of cascade development on Qingjiang River . The project is located across the border between BaDong county EnShi State and ChangYang County of YiChang City. 水布垭枢纽工程是清江梯级开发的龙头电站,工程占地跨恩施州巴东县和宜昌市长阳县两县。
- At the planning and design stage, Geheyan reservior regulation mode was studied thoroughly for controlling the flood of Qingjiang river and a clear and definite regulation scheme was suggested. 隔河岩枢纽在规划设计阶段深入研究了水库防御清江洪水的调度方式,给出了明确的调度方案。
- culture along Qingjiang River Basin 清江文化
- bank of Geheyan Reservoir on Qingjiang River 清江隔河岩水库库岸
- The river had worn a ravine between the hills. 那条河在两山之间已造成一个深谷。