Project and system situation in Zouxian Power Plant were introduced,and the piping design parameters and the piping material of main steam system and main feed water system were determined.

 
  • 对邹县发电厂四期工程和系统状况进行了介绍,确定了主蒸汽系统和主给水系统管道的设计参数,选择了管道材料。