您要查找的是不是:
- We estimate that this elicit program cost the Iraqis several billion dollars. 我们评估这个违法的计划将耗资伊拉克数十亿美元。
- Program Cost Estimate 计划成本估算
- Test Program Cost Estimate 试验计划成本估算
- What is included in a Landed Cost estimate? Landed Cost预算包括甚么内容?
- Assist PM for improving reliability of project cost estimate. 负责项目的成本分析和成本控制.
- How can I calculate my shipping charges for use in the Landed Cost estimate? 我怎样计算我的托运费用,以便用于Landed Cost预算?
- Receive an immediate cost estimate for your shipment before shipping. 您可以在寄件前取得即时的预估费用。
- Cost estimate of the expense portion, i. e. the equipment and materials. 费用部分,即设备和原料的成本估计。
- Parametric and bottom-up cost estimation. 参数及自下而上成本估算法。
- This in turn pushes up the program cost, estimated at about $3,800, including air fare. 这样就增加了留学的费用,加上飞机票,估计费用大约为3,800美元。
- Costs Estimate For Trade Marks Application in the FRANCE. 法国商标注册申请费用。
- Our Landed Cost engine provides you with a cost estimate of international shipments. 我们的Landed Cost引擎将为您提供国际货件的成本估算。
- Be responsible for cost estimate, planning, contract management and resource allocation. 负责成本控制,项目计划,合同管理及人员分配。
- Third, a cost estimate for the project was needed covering both the building and future running of the system. 第三,需要对系统的建设和今后的运行进行一次项目费用概算。
- Your Landed Cost estimate and actual shipment charges may vary for several reasons. 您的Landed Cost预算和实际托运费用不符可能有若干原因。
- And UNHCR, to obtain an independent review of the cost estimates. 验,请独立机构对费用概算进行审查。
- Cost estimate of maintenance manpower is the important part of military aircraft LCC cost estimate. 维修人力费用估算是军用飞机寿命周期费用估算的重要组成部分。
- Manage the project budget based on the cost estimation budget. 在费用评估预算的基础上管理项目预算。
- One inside source questions the agency's math: “The shuttle program costs about $4 billion, so if you only fly four shuttles, then the cost per shuttle is $1 billion each. 一位内部人士质问航天局的算法:“航天飞机项目大约花费40亿美元,因此如果你只发射四架航天飞机,那么每架航天飞机的费用是10亿美元。
- Per Unit key for material costing estimates. 每单位的关键材料成本的估计。