Presedimentation basins are constructed in excavated ground or out of steel or concrete: Steel and concrete tanks are often equipped with a continuous mechanical sludge removal apparatus.

 
  • 预沉池挖掘建造于地下或由钢筋混凝土制成。钢筋混凝土的沉淀池通常装有机械排泥装置。
今日热词
目录 附录 查词历史