您要查找的是不是:
- Prepare Final Acceptance Trial 准备最后
- final acceptance trial 最后交接试航,最后交货试验
- Formalize and obtain final acceptance for the project. 获得对项目的认同和正式接受。
- Final acceptance certificate issued by the PURCHASE. 买方出具的最后验证证明书。
- The final acceptance is in the charge of YFV at its site. 11检具的最终认可在延锋进行。由延锋负责组织。
- Final Acceptance Test of equipment and structures at supplier sites. 在供应商场地对产品进行验收。
- When the post finally became vacant, they offered it to Tina. (目光,表情等)无神的,茫然的,空虚的;茫然若失的
- We finally accept the conclusion as true. 我们最后承认这结论是真实的。
- The system integration and final acceptance testing of these equipment and facilities were completed in October. 整套管制系统的整合及最后验收工作也于十月完成。
- When the post finally fell(= became)vacant, they offered it to Fiona. 这个职位最终空出来之后,他们给了菲奥纳。
- Sarah's words of: "God's forgiving grace", kept passing through my mind, as a final acceptance materialized. 莎拉的话语:“上帝的宽恕之光”,不停地在我的耳边响起,我也终于明白其背后的意义。
- Any errors found in the dies during tryout and final acceptance test will be corrected by the die supplier at no additional cost to Su-dan. 任何在模具试模及接受过程中发现的错误应由供应商更正,任何相关费用与模具性能。
- Responsibilities: The mechanical engineer is in charge of the project from the design to the commissioning and final acceptance of the equipments. 岗位职责:机械技术工程师负责从设备设计、现场调试到最终验收的一系列工作。
- Compile the inspection and test plan of components purchased including process inspection and final acceptance inspection. 制定采购部件的检验试验计划,包括过程检验和最后验收程序的计划。
- She make a great show of reluctance, but finally accept our offer. 她对我们的建议做出极不满意的样子,但最后还是接受了。
- Responsibility - Manage the complete process of installation and commission of BIW equipment/line until final acceptance by customer is ach... 库卡柔性系统制造(上海)有限公司-工作地点:上海
- But he finally accepted the program at Tuskegee. 但他最终接受了塔斯基吉训练计划。
- Stephen was finally accepted into the family. 斯蒂芬最终被这个家庭所接纳。
- Installation supervision, commissioning, product testing till obtain the final acceptance Certificate. And provide after sales service, trouble shooting, etc. 安装指导,调试,产品测试直至项目签收,并提供售后及故障排除等服务。
- Actions on account of hidden defects cannot be brought (against the Contractor) after five years have elapsed since the date of Final acceptance of the Work. 工程最后验收日算起五年后,不得就隐藏缺陷(对承包商)提出诉讼。