Now bedplate and crankshaft have been delivered to the vessel and two engine manufacturer`s representatives were, as of 25/10, carrying out the engine rebuild.

 
  • 新的机座和曲轴已经到船,发动机制造厂的两名代表已经于10月25日到船组装发动机。
今日热词
目录 附录 查词历史