您要查找的是不是:
- Naval Medical Supply Unit 海军医疗补给小队
- naval medical supply depot 海军卫生补给仓库
- Preliminary laboratory confirmation was provided by a US Naval Medical Research Unit located in Cairo, Egypt. 美国设在埃及开罗的海军医学研究所提供了初步实验室确认。
- Medical Supply Unit 医用供应装置
- No air filter is considered for air supply unit. 新风处理机组没有考虑空气过滤处理。
- The case has been confirmed by the Egyptian Central Public Health Laboratory and by the US Naval Medical Research Unit No.3 (NAMRU-3). 该病例已得到埃及中央公共卫生实验室和美国海军第三医学研究处确认。
- The case was confirmed by the Egyptian Central Public Health Laboratory and by the US Naval Medical Research Unit No.3 (NAMRU-3). 该病例得到了埃及中央公共卫生实验室和美国海军第三医学研究处确认。
- Testing was conducted using a portable PCR field laboratory provided by the US Naval Medical Research Unit 3 (NAMRU-3) based in Cairo, Egypt. 使用设在埃及开罗的美国海军第三医学研究处(NAMRU-3)提供的便携式PCR现场实验室进行了检测。
- Tests conducted by both the national public health laboratory and the Cairo-based US Naval Medical Research Unit 3 (NAMRU-3) produced positive results. 国家公共卫生实验室和设在开罗的美国海军第三医学研究处开展的检测产生了阳性结果。
- Only medical supply trucks were granted safe passage through enemy territory. 只有运药物的卡车允许安全通过敌方领土
- The noise level of air supply unit should be marked on the drawing. 机组要有噪声要求。
- The case has been confirmed by the Egyptian Central Public Health Laboratory and by the WHO H5 Reference Laboratory, US Naval Medical Research Unit No.3 (NAMRU-3). 该病例已得到埃及中央公共卫生实验室和世卫组织H5参考实验室美国海军第三医学研究处确认。
- Samples from an initial 15 patients under investigation for possible infection were tested today at a US Naval Medical Research Unit located in Cairo, Egypt. 第一批15名接受疑似感染调查的患者的样本今日在位于埃及开罗的美国海军医学研究所进行了化验。
- Her infection has been confirmed by the Egyptian Central Public Health Laboratory and by the WHO H5 Reference Laboratory, US Naval Medical Research Unit No.3 (NAMRU-3). 其感染已得到埃及中央公共卫生实验室和世卫组织H5参考实验室美国海军第三医学研究处确认。
- Medical supply crates, sandbags and hospital beds lie scattered around the industrial interior of the brewery. 装有医药品的板条箱、沙袋、病床零乱地躺在啤酒厂的生产车间内部。
- The stabilized power supply unit for the detectors is mounted at the rear of the chassis. 检测器的稳压电源安装在框架后面。
- The Navy surgeons at Bethesda Naval Medical Center did an incomplete job of fixing his back. 他的后背受到非常大的伤害了,在贝塞斯达海军医疗中心,海军外科医生对他的背部做了不彻底的治疗。
- OBJECTIVE:To establish a standardized quality control system in hospital medical supply storeroom. 目的:探讨建立医院药库质量管理的规范化体系。
- Article13. The drinking water provided by a water supply unit must conform to the hygienic standards set by the state. 第十三条供水单位供应的饮用水必须符合国家规定的卫生标准。
- The drinking water provided by a water supply unit must conform to the hygienic standards set by the state. 第十三条供水单位供应的饮用水必须符合国家规定的卫生标准。