Much of 1997 was spent in the detailed planning of the project, which includes overall rationalisation of the berths at Kwai Chung and Tsing Yi.

 
  • 一九九七年,当局用了许多时间详细规划该项工程计划,包括重新分配葵涌及青衣的泊位经营权。
今日热词
目录 附录 查词历史