Modification of the existing Prince Edward Station Entrance B2 and construction of an approximately 160m long pedestrian subway constituting material change to the MTRC Prince Edward Station.

 
  • 修改现有的太子地铁站B2出口及兴建一条长约160米的行人隧道对太子地铁站构成实质改变。
今日热词
目录 附录 查词历史