您要查找的是不是:
- Do U mean taking the PLB 82 to the terminal and walk 15 mins to the main dam? 恐怕除了小巴%2382(荃湾兆和街上车;近众安街口)+步行15分钟;别无它法了...........
- The soft foundation dam section has two cracks in the Flying gorge key WR project main dam near Changshuitang because of uneven settlement influence. 飞来峡水利枢纽右岸长水塘附近的软基坝段因受坝基的不均匀沉降影响,产生了两条横向裂缝。
- The principle, method, and results for the design of the filter in the Siping earth-and rock-filled main dam are discussed in this paper. 摘要阐述寺坪土石坝反滤设计的原则、方法和成果。
- The lower reaches of the main dam seepage 26 liters per second, the main dam measured infiltration routes within the design infiltration routes. 主坝下游渗流量26升每秒,主坝实测浸润线低于设计浸润线。
- Project by the main dam, the auxiliary dam, spillway, water holes, with the dam and power station and other building components. 枢纽工程由主坝、副坝、溢洪道、输水洞、电站及引水坝等建筑物组成。
- In the course of construction of main dam foundation drainage holes for Baise Multipurpose Dam Project,few drainage holes had seen abnormal high drain discharge. 百色水利枢纽主坝坝基排水孔在施工过程中,少数排水孔出现排水量偏大的异常情况。
- Design, testing and research results of surface spillway tail-flaring pier joint energy dissipator of the RCC main dam of Baise Multipurpose Dam project is introduced. 介绍百色水利枢纽RCC主坝表孔宽尾墩联合消能工设计、试验研究成果。
- The main dam of the upper reservoir of Yixing Pumped Storage Power Station is a rockfill mixed dam with reinforced concrete face slab built on the inclined construction foundation surface. 摘要江苏宜兴抽水蓄能电站上水库主坝是建在倾斜建基面上的钢筋混凝土面板堆石混合坝,该坝型为国内外罕见。
- Through the Jintian reservoir main dam grouting ,the author sums up a feasible construction technique of dam slant drilling hole grouting , that accumulates experiences for future. 从金田水库大坝灌浆,总结出一套大坝斜孔造孔灌浆可行的施工工艺,为施工积累经验。
- In the course of main dam construction of Jinwo reservoir expansion project,the original upstream cement-rubble masonry gravity wall was utilized as temporary water retaining construction cofferdam. 金窝水库加高扩容工程在主坝施工过程中利用原上游浆砌石重力墙作为施工临时挡水围堰,根据库水位合理安排施工进度,控制重力墙基底应力,解决主坝施工、围堰安全、水库蓄水三者间的矛盾。
- Construction management of Baise RCC main dam 百色水利枢纽碾压混凝土主坝工程施工管理
- Test and study of admixture for RCC main dam 碾压混凝土主坝工程外加剂的试验研究
- east main dam of Tangpu reservoir 汤浦水库东主坝
- The main impediment to growth is a lack of capital. 影响发展的主要障碍是缺乏资本。
- Crowds thronged the main square of the city. 城里的大广场上挤满了人群。
- The whole school (was) assembled in the main hall. 全校在大礼堂集合。
- The main feature on the program is her song. 那个节目的主要号召物是她的歌。
- Fables often have animals as the main characters. 寓言常以动物为主角。
- A heavy snowfall block the main road. 一次严重的降雪阻塞了主要公路。
- The gas main explode and set fire to the house. 煤气总管爆炸引起房子失火。