您要查找的是不是:
- Lupu Brideg 卢浦大桥
- The first time I saw those words was about three years ago, in Chinese, written in huge font on a billboard along the road just after the Lupu Bridge in Pudong, Shanghai. 我第一次看见这几个字大概是三年以前,在上海浦东,下了卢浦大桥后往前开,路边的广告牌上就有这些字,中文的,字体很大。
- The paper introduces the structural form, span layout of T-girder of the approaches of Lupu Bridge, and designs and analyzes T-girders of various spans and bridge widths. 在对几座典型的减隔震桥梁介绍基础上,表明了减隔震技术在一些桥梁结构抗震设计或加固中的应用情况与所取得的良好的抗震性能。
- Maokou of the reef in the world wide distribution, the North American melon Da Lupu Kapi Tan Mountains Reef is the world's most typical of the reef, be regarded as the model of reef. 茅口期的礁在世界上广泛分布,北美瓜达鲁普山脉的卡皮坦礁是世界上最典型的礁,被视为礁的模式。
- Design of T-Girder of Approaches of Lupu Bridge 卢浦大桥引桥T梁设计
- Manufacturing LUPU bridge arch crane 卢浦大桥拱肋起重机制作与应用
- Collar Beam Design of Major Bridge of the Lupu Bridge 卢浦大桥主桥系梁设计
- Design and Construction of Temporary Cable and Tower System in Lupu Bridge 上海卢浦大桥临时索、塔体系的设计与施工
- Some Questions to Be Noted for Design and Construction of Embankment on Soft Soil Base in Brideg Head 桥头软基路堤设计与施工必须注意的若干问题
- Site Welding Technique for Main Span of Steel Structure in Lupu Bridge 卢浦大桥主桥钢结构现场焊接技术
- Approve the new material, working on brideg to communicate between SQE and product QE 新材料研发,作为SQE和产品QE间的联系桥梁
- Construction of Prestressed Main Bridge Pier Column of Shanghai Lupu Bridge 上海卢浦大桥主桥墩柱预应力施工
- Pre-stress Distribution and Construction Technologies of Main Tower Anchoring Zone of Songhuajiang Cable Stayed Brideg 松花江斜拉桥主塔锚固区预应力布置与施工工艺
- Ereetion of Sightseeing Platform onto the LUPU Arch Bridge in Shanghai 上海卢浦大桥拱顶观光平台安装
- The Bracket Structure and Pre-compression Measures for Construction of Tower Column Cross Beam No.2 Of Mashangxi Yangtse River Brideg 马桑溪长江大桥2%23墩浇注塔柱横梁的支架构造及其预压措施
- Practical Calculational Method about Obliquity Rivised of the Conduction Tubes and Main Parameters of Stays -cable When Tensioned at the Top of the Pylon of Cable- stayed Brideg 斜拉桥塔端张拉拉索倾角修正及拉索主要参数实用计算方法
- An Operation Technique for Installation the Temporary Cable Tower over the Lupu Bridge Shanghai 上海卢浦大桥临时索塔安装施工技术
- Construction of Deck Beam at Bank Span in Triangle Area of Main Bridge of Lupu Bridge by Double Machine Hoisting 卢浦大桥主桥三角区岸跨桥面梁双机抬吊施工
- The Research on Manufacture Technologies of Steel Structure Work of Lupu Arch Bridge 卢浦大桥钢结构制造技术研究
- pre-stress concrete brideg 预应力混凝土桥梁