您要查找的是不是:
- Influence of Jinping I Hydropower Station on Us? 锦屏一级电站将带给我们什么?
- Dongfeng hydropower station is open ski spillway. 东风水电站溢洪道为明流滑雪式溢洪道。
- Myanmar Yeywa hydropower station. 缅甸耶涯水电站
- They are going to dam up the river to set up a hydropower station. 他们准备拦江筑坝建水电站。
- The Xiangjiaba Hydropower Station adopts the middle development way so that its diversion tailrace system is comparatively long. 摘要向家坝水电站采用中部开发方式,引水尾水系统比较长。
- Hydropower Station Bridge Crane is a crane with a type. 水电站用桥式起重机是起重机的一种类型。
- Yinzidu hydropower station began ponding in April,2003. 引子渡水电站于2003年4月下闸蓄水。
- Jinghong hydropower station RCC dam is in the subtropics zone,the high temperature continues very long and the temperature control in dam construction is very difficult. 景洪电站地处亚热带,高气温时间长,大坝碾压混凝土施工温控难度高。
- They have got out a scheme to build a hydropower station in the hills. 他们已作出计划,准备在山里建造一座水电站。
- Several horizontal push-shear in-situ tests on SRM in an immersion state under water were carried at Long pan slope in Tiger-Leaping Gorge, and some significant conclusions were drawn. 摘要以虎跳峡龙蟠右岸地区分布的土石混合体为依托,对土石混合体在浸水条件下的力学响应进行了大型原位水平推剪试验,取得一些成果。
- Well do I remember the day when the hydropower station was put into operation. 我清清楚楚地记得水电站开始发电的那一天。
- Ertan hydropower station is the first power station built on Yalong River. 摘要二滩水电站是雅砻江梯级开发的第一个水电站。
- Therefore, we support the construction of the Sancha hydropower station. 会议中没有出现反对该项目建设的意见。
- The underground powerhouse of Xiluodu Hydropower Station is buried deeply, with few roads direct to the outside, long rout and densely distribution of caverns, so that it is difficult to ventilate. 摘要溪洛渡水电站地下厂房洞室群埋层深、直接对外的通道少、线路长、洞室群密集,通风散烟难度非常大。
- The device is valuable to be spread and used in hydropower stations with long penstock and in stations to be augmented. 对于具有较长的有压引水系统的水电站、需要增容扩建的水电站,这一装置具有一定的推广应用价值。
- This paper presents the turbine model acceptance test and the test results of Feilaixia hydropower station. 简要介绍了飞来峡水电站水轮机的模型验收试验的情况及结果。
- Economic operation of hydropower station is very important for electric power system. 摘要水电站经济调度是电力系统调度的重要环节。
- Practice proved that the option on electromechanical equipment for Letan hydropower station was rational. 实践证明,乐滩水电站机电设备的选型是合理的。
- Dam core impervious material quality is critical to dam quality of Shiquanhe hydropower station. 大坝心墙防渗掺合料的生产质量是狮泉河水电站大坝质量控制的关键。
- Study on Existing Environment of Hydropower Station during System Reform Period. 水力发电厂转型期相关生存环境剖析与研究。