您要查找的是不是:
- Construction of a section of the Sheung Shui to Lok Ma Chau Spur Line railway. 建造上水至落马洲支线铁路的其中一段。
- Visitors can travel to from the Lok Ma Chau Spur Line Control Point via KCR Lok Ma Chau Spur Line. 旅客可选择乘搭九广铁路落马洲支线往来落马洲支线管制站。
- Construction work on the Lok Ma Chau Spur Line Control Point has almost been completed. 落马洲支线管制站的建筑工程已大致完成。
- The KCRC is planning and implementing West Rail (Phase I),the Ma On Shan rail link,the TST Extension and the Sheung Shui to Lok Ma Chau spur line. 九广铁路公司现正进行西铁(第一期)、马鞍山铁路、尖沙咀支线和上水至落马洲延线的规划和实施工作。
- The Railway Development Office co-ordinates the implementation of the Sheung Shui to Lok Ma Chau Spur Line and the Kowloon Southern Link. 铁路拓展处负责协调多项铁路计划的实施,包括:上水至落马洲支线及九南线。
- The KCRC is planning and implementing West Rail (Phase I), the Ma On Shan rail link, the TST Extension and the Sheung Shui to Lok Ma Chau spur line. 九广铁路公司现正进行西铁(第一期)、马鞍山铁路、尖沙咀支线和上水至落马洲延线的规划和实施工作。
- The 7.5-kilometre Sheung Shui to Lok Ma Chau spur line,that will connect the KCR at Sheung Shui with a new passenger rail boundary crossing at Lok Ma Chau. 上水至落马洲延线全长7.;5公里,连接九广铁路上水站和落马洲的新铁路过境通道。
- The Panel met with the transport trades to receive views on traffic and transport arrangements for the commissioning of the Sheung Shui to Lok Ma Chau Spur Line. 事务委员会与运输业界举行会议,听取他们对上水至落马洲支线通车后的交通及运输安排的意见。
- The Administration provided supplementary information on traffic and transport arrangements for the commissioning of the Sheung Shui to Lok Ma Chau Spur Line. 政府当局向委员提供有关上水至落马洲支线通车后的交通及运输安排的补充资料。
- The 7.5-kilometre Sheung Shui to Lok Ma Chau spur line, that will connect the KCR at Sheung Shui with a new passenger rail boundary crossing at Lok Ma Chau. 上水至落马洲延线全长7.;5公里,连接九广铁路上水站和落马洲的新铁路过境通道。
- General Advice to Visitors Heading for the Lok Ma Chau Spur Line Control Point 给前往落马洲支线管制站旅客的建议
- Transport Department - Access to Lok Ma Chau Spur Line Control Point 运输署-前往落马洲支线管制站
- Public Transport Services Arrangements for Lok Ma Chau Spur Line Control Point 落马洲支线管制站的公共运输服务安排
- Public Transport Services to from Lok Ma Chau Spur Line Control Point 往来落马洲支线管制站的公共运输服务
- Information paper entitled "Public Transport Arrangements at Sheung Shui to Lok Ma Chau Spur Line" provided by the Administration 政府当局提供题为"上水至落马洲支线的公共交通安排"的资料文件
- Lok Ma Chau Spur Line 落马洲支线
- To meet cross-boundary traffic demand,we are also planning to build a spur line which will connect the KCR at Sheung Shui with Lok Ma Chau,for completion in 2004. 为了应付日益增加的过境乘客量,我们也会建设一条连接上水和落马洲的九广铁路延线,并预期会在二零零四年完成。
- To meet cross-boundary traffic demand, we are also planning to build a spur line which will connect the KCR at Sheung Shui with Lok Ma Chau, for completion in 2004. 为了应付日益增加的过境乘客量,我们也会建设一条连接上水和落马洲的九广铁路延线,并预期会在二零零四年完成。
- San Sham Road and Lok Ma Chau Control Point. 通往新深路及落马洲管制站的天桥。
- The project starts from Chau Tau terminates at Lok Ma Chau. 本工程由落马洲的洲头火车站开始。