It is proved that the designed gating, overflow well and air vent are reasonable, which can stabilize the whole filling process.

 
  • 经分析验证证明:所设计的浇道及溢流槽、排气槽合理,整个充填过程平稳。
今日热词
目录 附录 查词历史