It includes the division of dissolving area, the redetermination of its length and width,downhill layout of dissolving area a nd improvement of drilling tunnel and cutting grooves.

 
  • 包括溶区的划分,溶区长、宽的重新确定;溶区间的下山布置,以及打眼巷、切割槽的改进等。
今日热词
目录 附录 查词历史