Influenced by the Planned System,survey and design body has long neglected the multi-object feature of project,so the benefit of some construction attendants cannot be met adequately.

 
  • 勘察设计单位长期以来受计划体制模式影响,忽视了项目的多目标属性,使项目相关者的利益没有得到充分的满足。
今日热词
目录 附录 查词历史