您要查找的是不是:
- Independent Cost Estimate 独立成本估计
- What is included in a Landed Cost estimate? Landed Cost预算包括甚么内容?
- And UNHCR, to obtain an independent review of the cost estimates. 验,请独立机构对费用概算进行审查。
- Assist PM for improving reliability of project cost estimate. 负责项目的成本分析和成本控制.
- How can I calculate my shipping charges for use in the Landed Cost estimate? 我怎样计算我的托运费用,以便用于Landed Cost预算?
- Receive an immediate cost estimate for your shipment before shipping. 您可以在寄件前取得即时的预估费用。
- Cost estimate of the expense portion, i. e. the equipment and materials. 费用部分,即设备和原料的成本估计。
- Parametric and bottom-up cost estimation. 参数及自下而上成本估算法。
- Independent Government Cost Estimate 独立的政府开支估计
- But some objections are based on cost estimates from an independent agency, the Congressional Budget Office. 但是一些反对的是基于来自单独的代理,国会预算办公室的花费估计。
- Costs Estimate For Trade Marks Application in the FRANCE. 法国商标注册申请费用。
- Independent Parametric Cost Estimate 独立参数成本估算
- Our Landed Cost engine provides you with a cost estimate of international shipments. 我们的Landed Cost引擎将为您提供国际货件的成本估算。
- Be responsible for cost estimate, planning, contract management and resource allocation. 负责成本控制,项目计划,合同管理及人员分配。
- Third, a cost estimate for the project was needed covering both the building and future running of the system. 第三,需要对系统的建设和今后的运行进行一次项目费用概算。
- Your Landed Cost estimate and actual shipment charges may vary for several reasons. 您的Landed Cost预算和实际托运费用不符可能有若干原因。
- Cost estimate of maintenance manpower is the important part of military aircraft LCC cost estimate. 维修人力费用估算是军用飞机寿命周期费用估算的重要组成部分。
- Manage the project budget based on the cost estimation budget. 在费用评估预算的基础上管理项目预算。
- Per Unit key for material costing estimates. 每单位的关键材料成本的估计。
- Based on that, developed a B/S structure cost estimation system. 在此基础上,开发了基于B/S结构的成本估算系统。