In the simulation, the fracture dip and groundwater are taken into account, and the grouts are regarded as time dependent Bingham fluids.

 
  • 模拟时考虑了裂隙的倾角和含水情况,将浆液视为与时间有关的宾汉流体,并就不同的地质、材料和工艺参数所得到的模拟结果作了对比。
今日热词
目录 附录 查词历史