In the process of tunneling, the means of deformation surveying and monitoring was adopted, and the monitoring results shows that it is effective to control the fall of roof by mans of timely primary support.

 
  • 施工过程中,采用了变形监测手段,监测结果表明,及时的初次支护是控制拱顶下沉的有效措施。
今日热词
目录 附录 查词历史