In construction, supporting measures such as steel pipe pile, high-pressure impervious board wall were adopted, ensuring the excavation of base pits.

 
  • 在施工中采用了钢管桩、高压防渗板墙、槽内降水、槽外注水回灌,外加复合土钉墙支护措施,保证了基坑开挖。
今日热词
目录 附录 查词历史