In construction of signalling system in station, the station conduction test needs to be done to verify the correction of signalling equipment interlocking.

 
  • 在车站信号工程的施工中,开通前都要进行车站联锁导通试验,以验证信号设备联锁的正确性。
今日热词
目录 附录 查词历史