If the Contractor encounters adverse physical conditions which he considers to have been Unforeseeable, the Contractor shall give notice to the Engineer as soon as practicable.

 
  • 如果承包商遇到了在他看来是无法预见的外界条件,则承包商应尽可能快地通知工程师。