If the Contractor does not so give notice to the Engineer within 14 days after being requested to examine the records, they shall be accepted as accurate.

 
  • 如果承包商在被要求对记录进行审查后14天内未向工程师发出此类通知,则认为它们是准确的并被接受。
今日热词
目录 附录 查词历史