However, due to its specialty in fabrication process, this kind of pile has the transfer length issue similar to those prestressed concrete members with pretensioning method.

 
  • 然而由于大管桩制作工艺的特殊性,使其具有类似先张法预应力混凝土构件的预应力传递长度问题。
分享单词到:
今日热词
  • 深远海浮式风电平台 - deep-sea floating wind power platform
  • 京雄高速公路 - Beijing-Xiongan expressway
  • 农业及相关产业增加值 - the added value of agriculture and related industries
目录 附录 查词历史