- It introduces the working principle of PTX1830 fluviograph and its successful application in Gezhouba Shiplock control system. 介绍PTX1830水位计的工作原理及其在葛洲坝船闸控制系统中的成功应用。
- Based on the experience and lessons of lockage safety in Gezhouba Shiplock, the problem concerning lockage safety of multi-step shiplock were analyzed and approached. 根据葛洲坝船闸船舶过闸安全的经验教训,对多级船闸船舶过闸安全问题进行初步分析与探讨。
- Operation Practice of the Reversed Water Radial Gate for Water Filling and Emptying of Gezhouba Shiplock 葛洲坝船闸输水反弧门运行实践
- Gezhouba shiplock 有机物降解
- China Gezhouba Construction Group Corp. 中国葛洲坝水利水电工程集团公司
- Gezhouba Dam was originally an ancient city in ruins. 葛洲坝原是一座古城的遗址。
- It has descended obviously since the construction of Gezhouba. 自葛洲坝修建以来,宜昌断面枯水位明显下降。
- Gezhouba dam is one of the largest sluice gates on a inside river in the world. 葛洲坝是世界上最大的内河船闸之一。
- "And" Guo "and" GE "is similar to the Music, was known as the" Gezhouba Dam. 而"郭"与"葛"音又相近,便被人们称为"葛洲坝"。
- By comparison of the measured data and monitoring and control indices,this paper evaluates the stability of the permanent shiplock slope. 通过对实测数据和监控指标的比较,对永久船闸边坡的整体稳定性和局部稳定性进行了评价。
- The Three Gorges Dam located at Sandouping, 38 kilometers upstream from the Gezhouba dam. 三峡大坝位于葛洲坝上游的三斗坪,和葛洲坝相距仅38千米。
- All units of the Three Gorges Project made by the Gezhouba Group, responsible for the installation. 三峡工程国产机组全部由葛洲坝集团负责安装。
- Design of the overall layout of shiplock, lock chamber and guide wall structure, as well as the water filling %26 emptying system of Dayuandu Junction are introduced. 介绍大源渡枢纽船闸的总平面布置、闸室和导航墙结构、输水系统等设计情况。
- The technical measures for capacity extension of 125 MW hydropower units of Gezhouba hydropower station are described. 介绍了葛洲坝电站125MW水轮发电机组增容改造的技术措施。
- This paper analyzes the situation of cracks in concrete of shiplock's chamber wall, summarizes relevant preventive measures, and proposes treatment schemes for the existed cracks. 摘要分析船闸工程闸室侧墙混凝土裂缝的状况,总结预防此类裂缝发生的措施,对裂缝提出处理方案。
- The high slope of permanent shiplock is a major building of TGP, also an important part of shiplock structures, which is broad in scale and complicatied in technology. 永久船闸高边坡是三峡工程的重要建筑物,也是船闸结构的重要组成部分,规模巨大,技术复杂。
- CGGC established three Top One in China in 1987 during the construction of Gezhouba HPP, i.e. annual installed sets, capacity and progress of the turbo-generator units. 1987年,葛洲坝集团在葛洲坝工程建设中创造了当时年装机台数、容量和进度"三个全国第一"。
- It introduces how the Jiangyin Shiplock was opened by utilizingthe tide, in combination with strengthening of site administration, to improve the shiplock capacity. 介绍江阴船闸如何利用潮汐开放通闸,加强现场管理,提高船闸通过能力。
- In the reverse-tainter-gate-tunnel design of a high-rise shiplock water-filling system, it is of crucial importance to prevent flow cavitation and gate vibration. 在本部分,结合对近几年研究成果的总结,分析了水流空化成因与流态振荡机理,为探讨合理的减蚀防振措施提供理论依据。