- The technical measures for capacity extension of 125 MW hydropower units of Gezhouba hydropower station are described. 介绍了葛洲坝电站125MW水轮发电机组增容改造的技术措施。
- The Three Gorges Hydropower and Water Conoervancy Project is the largest hydropower station in the world after completion of Gezhouba Hydropower station on the ChangjiangRiver. 摘要三峡水利枢纽是继葛洲坝水利枢纽建成后在长江上修建的世界第一大水电站,规模宏大,举世瞩目,具有巨大的防洪、发电、航运等综合效益,是开发治理长江的骨干工程。
- Reform and Capacity-Increasing of Generating Set in Gezhouba Hydropower Station 葛洲坝水轮发电机组的改造增容
- Present status and renovation of anti-wind device for the portal crane in GeZhouBa hydropower station 葛洲坝电站门机防风装置的现状及改造
- Non-uplift wire alignment monitoring automation system in Gezhouba hydropower station 无浮托引张线自动化观测系统在葛洲坝水电站的应用
- Electric stress measurement technology and testing methods of delivery water conduit of #3 ship lock in the Gezhouba Hydropower Station 葛洲坝%233船闸输水廊道工作阀门应力电测工艺及测试方法
- Gezhouba hydropower station 引张线
- Our company is the Gezhouba Group - Construction of the Xiluodu hydropower station and the successful bidder designated supplier of accessories! 我们公司是葛洲坝集团-溪洛渡水电站施工局指定并中标的配件供应商!
- Influence of Jinping I Hydropower Station on Us? 锦屏一级电站将带给我们什么?
- Dongfeng hydropower station is open ski spillway. 东风水电站溢洪道为明流滑雪式溢洪道。
- Myanmar Yeywa hydropower station. 缅甸耶涯水电站
- They are going to dam up the river to set up a hydropower station. 他们准备拦江筑坝建水电站。
- Hydropower Station Bridge Crane is a crane with a type. 水电站用桥式起重机是起重机的一种类型。
- The index system was applied in this paper to evaluate the changes of eco-hydrological characteristics in the middle reach of the Yangtze River after the construction of Gezhouba hydropower project. 分析认为,葛洲坝的修建主要影响涨水落水,对其它生态水文特征影响不大;
- Yinzidu hydropower station began ponding in April,2003. 引子渡水电站于2003年4月下闸蓄水。
- They have got out a scheme to build a hydropower station in the hills. 他们已作出计划,准备在山里建造一座水电站。
- Well do I remember the day when the hydropower station was put into operation. 我清清楚楚地记得水电站开始发电的那一天。
- Ertan hydropower station is the first power station built on Yalong River. 摘要二滩水电站是雅砻江梯级开发的第一个水电站。
- Therefore, we support the construction of the Sancha hydropower station. 会议中没有出现反对该项目建设的意见。
- This paper presents the turbine model acceptance test and the test results of Feilaixia hydropower station. 简要介绍了飞来峡水电站水轮机的模型验收试验的情况及结果。
- 今日热词
-
- 深远海浮式风电平台 - deep-sea floating wind power platform
-
- 京雄高速公路 - Beijing-Xiongan expressway
-
- 农业及相关产业增加值 - the added value of agriculture and related industries