From April 16, the Chinese side began to compile the Simulation Test Guideline (the Semi-Hardware-in-the-Close-Loop Simulation Test Guideline for the Four-Axis Inertial Platform Failure Mode) and prepare the method and conditions for the test.

 
  • 4月16日起,中方着手编制仿真试验大纲,对试验方法及实现条件进行了一系列准备。
今日热词
目录 附录 查词历史